圖片展示
  • 繁體中文
  • 中文
  • English
J107 Metro Station Roof Steelwork
Structural Steel Fabrication
案例詳情

The total weight was 1,300 tons, and LTA inspected the factory. Strictly followed LTA requirements, RTO inspected the factory, and ITA supervised the manufacturing throughout the process. The project was delivered smoothly.


聯系我們

電 話:0750-6286288

郵 箱:6286288@mecomgba.com

澳能國際新材料科技(廣東)有限公司 版權所有
添加微信好友,詳細了解產品
使用企業微信
“掃一掃”加入群聊
複製成功
添加微信好友,詳細了解產品
我知道了