圖片展示
  • 繁體中文
  • 中文
  • English
J102 Metro Station Roof Steelwork
Structural Steel Fabrication
案例詳情

Total 1,200 tons and uses external flange nodes. The nodes are complex, and there are 15,000 flanges in total. A 3D total station is used to control the node size. RTO is on-site to supervise the whole process, and ITA supervises the quality of the entire process.


聯系我們

電 話:0750-6286288

郵 箱:6286288@mecomgba.com

澳能國際新材料科技(廣東)有限公司 版權所有
添加微信好友,詳細了解產品
使用企業微信
“掃一掃”加入群聊
複製成功
添加微信好友,詳細了解產品
我知道了