图片展示
  • 繁體中文
  • 中文
  • English
J107 Metro Station Roof Steelwork
Structural Steel Fabrication
案例详情

The total weight was 1,300 tons, and LTA inspected the factory. Strictly followed LTA requirements, RTO inspected the factory, and ITA supervised the manufacturing throughout the process. The project was delivered smoothly.


联系我们

电 话:0750-6286288

邮 箱:6286288@mecomgba.com

澳能国际新材料科技(广东)有限公司 版权所有
添加微信好友,详细了解产品
使用企业微信
“扫一扫”加入群聊
复制成功
添加微信好友,详细了解产品
我知道了